St Peters Junior School, Littleover

Bonser Building Contractors were appointed as the principal contractor for classroom refurbishment works on the behalf of YMD Boon at St Peters Junior School in Littleover. The works were undertaken by Scott Bonser with Adrian Preston appointed as the site foreman. The works required general refurbishment works to three classroom required new flooring, decoration and wet areas, along with alterations to the layouts of the mechanical and electrical systems in all three rooms.

The works also required for the extension of one classroom, and the removal of existing windows located within the roof. The proposed classroom extension required forming a new opening within an existing internal brick wall and a secondary stud built to increase the size of the main classroom being refurbished by around 3 meters. Where the existing windows were within the roof had to be removed, Bonser’s had to infill the roof structure and all roof coverings to tie in with the existing building as closely as possible.

During the works, various alterations to the proposed works were instructed but despite these alterations, some major, the works were still completed on time and to a high specification finish.

The works were handed back over to the school on the 2nd of September.

2013-06-20 15.51.17

2013-06-20 16.10.34

2013-06-20 15.55.35

2013-07-23 15.51.43

2013-07-29 11.04.44

2013-07-29 11.04.03

2013-09-02 09.35.07

2013-09-02 09.45.59

2013-09-02 09.38.01

2013-08-08 14.52.29