Newbridge High School, Hall Mezzanine

The two main fabricated steel sections that support the main mezzanine flooring

The two main fabricated steel sections that support the main mezzanine flooring

The main hall room following the steel installation

The main hall room following the steel installation

One of the high level studs to the mezzanine following plasterboard

One of the high level studs to the mezzanine following plasterboard

Bonser Building Contractors have been the appointed contractors for installing a large mezzanine floor above the main schools hall at Newbridge High School, the structure required the use of structural steels provided and installed by sub-contractors Maltone Fabrication.

Once the structural steels were installed, these were then in-filled with timber joists to make two mezzanine floor sections with a central opening remaining up to the original ceiling height. stud work was then installed directly above the two main support beams to separate the mezzanine into rooms.

Further details will be posted as the works progress…